Examples of the introduction of Chuseki/LLW (1)
The annual water and sewage fees, which were approximately 80 million yen, have been reduced by 20% to 30%!
This is an introduction to a case study on "cost reduction through the reduction of cooling tower usage." The installation location is a certain railway station building, and the target is 7,000 refrigeration tons. After the installation of LLW, the set value of the automatic blowdown device was managed from 700 to 1,800 μS/cm. As a result, the annual water and sewage fees, which were approximately 80 million yen, were reduced by 20% to 30%. 【Overview】 ■ Installation location: Certain railway station building ■ Target: 7,000 refrigeration tons ■ Processing details: After the installation of LLW, the set value of the automatic blowdown device was managed from 700 to 1,800 μS/cm ■ Effect: The annual water and sewage fees, which were approximately 80 million yen, were reduced by 20% to 30%. *For more details, please refer to the PDF document or feel free to contact us.
- Company:グローバルファーム
- Price:Other